CH2M HILL VECO

Fast facts

Since 1996, WRENCH customers have reported 40-60% reduction in engineering time cycles 100% quality compliance, and increased productivity.

Select Number of records per page:

CH2M HILL VECO

As a global leader in full-service engineering, consulting, construction, and operations, CH2M HILL has the human and technical resources, the international footprint, and the depth of know-how and experience to help you achieve success in any corner of the world.

"With the actual status of each deliverable getting updated automatically to our project plan, we are able to take instant decisions based on the project progress instead of chasing resource for the status."

Mr. Nasir Ahamed, Manager,
Project Control,
CH2MHILL VECO Engineering

Country : United Arab Emirates
Type : Consultant
Download : Case study
Website : www.ch2m.com

Case Study :

Business Need

To plan and execute multiple projects across various locations, and to control costs, timelines
and quality.

Requirement

Apply ‘lean construction’ principles to set up an infrastructure that could integrate all teams, data, and systems into a single platform.
Give managers a way to define all the deliverables
of a project, monitor them, capture the design data generated by each user, and route them automatically to all concerned groups in a streamlined, secure manner – and to achieve all this online, and in real-time.

Solution chosen: WRENCH Enterpriseâ„¢

Benefits

Can now plan, execute and monitor multiple projects at a fraction of the earlier cost and time spend. The single online platform has maximized the value of all the existing technologies
previously in use, including Primavera,
MSOutlook, MSExcel, etc. All employees can now share information and communicate online, while managers can track progress and enforce quality in realtime.

  • All stakeholders are able to collaborate cost-effectively.
  • Engineering cycle time, down by 40% through online access of data and reuse of data across projects.
  • Clients assured of ISO compliance.
  • Team efficiency is up by 25%.

 Download Case study




Download:

  Customer Reference Document [464 KB]

Increase   Decrease Font Size Print E-mail