Since 1996, WRENCH customers have reported 40-60% reduction in engineering time cycles 100% quality compliance, and increased productivity.

Exploring WRENCH | enterpriseâ„¢ by industry
Construction
WRENCH | enterprise™ as a Project monitoring tool and as a efficient document management tool in construction industry Collaboration between internal team, consultant, client and sub contractors at site
This industry requires constant collaboration between he client, contractors and consultant in site.
WRENCH | enterprise™ ensures that all users working from remote locations use a single integrated system and the latest document versions are available throughout the system. Monitoring and Optimizing Manpower: Monitoring and optimizing manpower is a requisite in the industry. In WRENCH | enterprise™ there is an automated monitoring system to manage manpower and generate weekly reports regarding the same.
Tailor made Correspondence management to suit the construction Industry
All the major communication from the clients, sub contractors and consultants happen electronically. Project managers may file these documents in their personal folders and hence there is the risk of misplacement of important design documents and the added time delay in the retrieval of documents. WRENCH | enterprise™ has a correspondence management system that integrates all communication and attachments seamlessly in to the project control mechanism. Correspondence is saved under relevant projects and all the correspondence threads can be retrieved at a later point. The communication is made available centrally, is secure and can be easily retrieved.
Control on the Projects and Stringent Monitoring of Projects
Another characteristic of this industry is the huge number of deliverables in a project. They are outsourced to vendors and subcontractors and stringent monitoring is required so that all of them are procured on time. There might be at least .1 million deliverables in a project. Project planning managers will be tracking at least fifteen projects at a time. In WRENCH | enterprise™ the percentage of progress will be updated automatically as the workflow progresses and hence project monitoring is efficient and easy.





















