Fast facts

Fast facts

Since 1996, WRENCH customers have reported 40-60% reduction in engineering time cycles 100% quality compliance, and increased productivity.

Select Number of records per page:

  • Since 1996, WRENCH | enterprise™ customers have reported 40-60% reduction in engineering time cycles 100% quality compliance, and increased productivity.
  • As per Khatib & Alami (UAE), the time taken to upload/download files to an FTP server for sharing files between multiple engineering office (files size of 20-30Mb) has been 40-60 minutes per file which was done manually.
  • This has been completely avoided by WRENCH | enterprise™ implementation using its automatic data replication methodology.
  • 40% reduction in Engineering cycle time due to reusability of project data.
  • 100% protection for all data and IP - but without compromising on data accessibility (as per ISMS-Standards)
  • 3 months after using WRENCH | enterprise™, Oil and Gas Engineering major, VECO Engineering (UAE) reported a 20% drop in engineering cycle time and a steep rise in productivity.
  • WRENCH has been granted the funding for Technology Development and Application after evaluation by the Technology Development Board of the Science and Technology department of India.
  • Recently, Wrench achieved the remarkable status as the Microsoft Gold Certified Partner on the basis of three technical competency parameters: ISV/ Software Solutions, Network Infrastructure Solutions. & Mobility Solutions.
  • WRENCH SOLUTIONS has over 60% market share in India, with some of the biggest players in the market like L&T, Vatech Wabag, BHEL PEM, Khatib & Alami, Metito, Bajaj, Tata, TVS, BHEL, MICO, Kennametal, L&T, ISRO& DRDO.
  • Simon carves (UK) chooses WRENCH | enterprise™ as the platform to integrate there multiple Engineering office located in Singapore and India and to centrally manage the projects from UK.

Increase   Decrease Font Size Print E-mail